AC•Tech specializes in preventing excessive moisture, alkalinity and oil contamination from causing commercial flooring failures in renovation, remodeling and retrofit projects. For trenching and tenant improvement…
Browsing: Go early technology
AC Tech’s Go-Early Technology was nominated for the Most Innovative Product award at 2015’s World of Concrete and is built on the AC Tech 2170 Fast-Curing,…
Installing AC•Tech 2170 Vapor Reduction Systems with its patented Go Early Technology three-to-five days after a concrete slab has been poured adds unique benefits to the…